А. В. Трофимов
39 works · 9 citations · h-index 1
Top works
- Determination of physical and mechanical properties of rocks using anti-burst destress measures
- The use of deep borehole imaging data in reconstruction of active stress mode at a polymetallic deposit of intrusive genesis
- Methodology of geomechanical block modeling of rock mass in Taimyrsky Mine field
- Justification of reinforcement technology and operating conditions for permanent ore passes in faulted rock mass in Oktyabrsky Mine
- Numerical Modelling of Stress-and-Strain Behaviour of Deposit Deformed by Mining Operations Using Step-By-Step Calculation Function in the CAE Fidesys Software System
- Non-destructive ultrasonic method of testing the strength of backfill concrete at deep Talnakh mines
- Analysis of grain size distribution in broken rock mass in the Oktyabrsky Mine
- Blasting-induced seismic impact on protected objects on ground surface at Zapolyarny Mine of Medvezhyi Ruchei LLC
- Geomechanical survey procedure for Oktyabrsky mine
- Нанесение и исследование свойств оксидно-алюминиевых катализаторов на стеклянные подложки
- Application of microseismic monitoring data in prediction of stoping influence zone size: A case-study of Oktyabrsky Mine
- Risk assessment in main ore chute construction in difficult geological conditions based on integrated geotechnical research
- Development and pilot testing of plasticized backfill mixtures in mines of the Polar Division of the Norilsk Nickel Mining and Metallurgical Company
- Selection of the location for ore pass construction on the basis of finiteAelement modeling with the use of CAE Fidesys software suite Источник: https://mining-media.ru/en/articleen/14512-selection-of-the-location-for-ore-pass-construction-on-the-basis-of-finiteaelement-modeling-with-the-use-of-cae-fidesys-software-suite
- Finite-element modeling-based geotechnological grounding of the development of mineral deposits confined to tectonic faults
- Geotechnical justification of primary cutting of the ore body of rich ore deposits of “Glubokaya” mine using methods of stepwise numerical simulation under gravitational-tectonic stress field conditions
- Studies into properties of Maslovskoe complex ore deposit and enclosing rock mass
- Designing blast patterns by calculation of fracture zones and ore zoning by physical and mechanical properties
- Justification of safe cut-and-fill mining under water bodies using empirical and numerical methods
- Stress–strain determination in Oktyabrsky Mine SS-1 skip shaft area by overcoring