Сравнительный анализ технологий подготовки выемочного столба при отработке мощного угольного пласта

Микунов Василий Васильевич, Волошин Владимир Анатольевич, Риб Сергей Валерьевич · Вестник Сибирского государственного индустриального университета · 2015

The article presents a comparative analysis of preparation technology of extraction pillar when developing thick coal seam. The technology is proposed to develop workings by two stopes by seam thickness: the first stope development is carried out by a small section of the upper layer, and the second one is followed by coal mining in the soil to a depth of 1 m (just before the delivery installation works) to the design section by dinting. The air roadway is considered; it is conducted on a layer 6 in the mine “Alardinskaya”. In the present embodiment, the technology of driving cycle time is reduced by 30 minutes compared with the current one; that will increase the pace of developments up to 250 m / month, as well as speed up the whole time on the delineation excavation site from 16 to 12 months. It is shown that the proposed preparation technology of extraction pillar on thick seams will allow: to increase the average rate of contouring workings; repay the cost of the extra work due to mined coal in the capture of dinting; reduce the cross-section of the development in the sinking and reduce significantly the cost of ventilation.

Cited by 0 works.

Authors