개방형 슬래브를 이용한 지하 역타공법
전금석, 고수진, 염경수 et al. · 한국건축시공학회 학술.기술논문발표회 논문집 · 2006
In recent years, construction site has developed lots of new method sand materials for Time-Cost Trade-off and improving constructability. In the case of underground construction, especially, there are many restrictions and difficulties. Shortening of the construction time in construction of underground, we use top-down method in undergroud wall. A open slab has been designed for the purpose of overcoming a weak point of former top-down method. This study based on open slab on the under ground top-down method, to more improve constructability, to introduce the effect and the performance of top-down method.
Cited by 0 works.