철도종합시험선로 구축 필요성 및 추진 기본전략

김태욱, 이희업, 최원일 · 한국철도학회 학술발표대회논문집 · 2011

To carry out the evaluation of performance of railway product/system, 3 step verification process(design review-lab test-field test) should be done. In advanced countries, for the effective field test, test-only-oriented have been constructed and used. In Korea, government announced The construction plan of railroad test track at 2009.06. This paper will summarize of test track, technical meaning of test track, current status of foreign test track, fundamental plan and process strategy of Korea Railroad Test Track. It is no need to say that the wisdom of all railroad related people is required for the successful construction and usage of Korea Railroad Test Track