요인분석을 통한 공종별 체크리스트 작성에 관한 연구
이재옥, 윤여완, 김천학 et al. · 2002
The purpose of this study was to Estimation the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of construction field. So we rearrange the individual item of inspection list to match the Risk factor. The results of this study were as follows; The inspection list was rearranged at Risk checklist for Risk estimation. So that we estimate the Risk of individual construction method.
Cited by 0 works.