소수력 발전소의 건설 타당성 분석기법
박완순, 이철형, 정상만 · 한국태양에너지학회 학술대회논문집 · 1998
The methodology and feasibility analysis model for small hydropower plant has been studied and developed. It consists of two main part, the performance prediction model to estimate the performance characteristics and economics anaysis model to evaluate economical characteristics for surveyed sites. The performance characteristics and feasibility assessment for surveyed sites were analyzed, using developed models. Also, primary design specifications such as design flowrate, capacity, load factor were estimated and discussed for surveyed sites in Dan-yang and feasibility was suggested through analyzing the investment, unit cost and payback period.
Cited by 2 works.