수평축 조류발전건설시 공종별 특성과 산업잠수의 작업한계에 관한 연구

김원석, 유창일, 류청로 · 한국해양환경·에너지학회 학술대회논문집 · 2012

Marine energies are various and powerful, but it is so hard to work underwater construction. Therefore commercial diving work is very important to install various deep structures. Jangjuk channel is famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics cf commercial diving works with construction of tidal current generation. The purpose of this study is to introduce commercial diving with work types and investigate ciritical limits of diving working under the conditions, which are working only 40 minutes at slack tide at slack tide during the neap tide. As the results, work types are five, mooring installation, OMAS (Offshore Maintenance Access System), support structure installation, cable and turbine installation, and are taken during the 18 months. At that time, entire diving working times are 110th. Entire construction period took 18 months and was over 4.5 times more than planned schedule (4 months). Extended construction period is due to insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time.

Cited by 0 works.

Authors