고속도로 횡단구간 아치교량 가설공법 선정 및 시공

김영민, 김대왕, 박석기 et al. · 한국철도학회 학술발표대회논문집 · 2013

The steel arch bridge of Honam Rapid-transit railway of Jeong-ji overpass is the simple bridge with the span length of 80 meters, crossing the highway of Cheonan-Nonsan with the angle of 168 degrees. We examined both the sliding slope lifting + the incremental launching method and the heavy lifting + the incremental launching method as the method which are able to make the bridge overpass the highway maintaining vehicle traffic during the construction. The Heavy lifting + the incremental launching method were selected considering the limitation of the lease of the site, period of construction, the construct ability and the economics after the comparisons. After the assembly of the temporary bents, the bridge which was assembled on the ground was moved by the heavy lifting using the vertical jack and the incremental launching with the horizontal jack. The virtual simulation was performed with the BIM for the examination for the erection method and the confirmation of the safety before the construction. Also, the safety was confirmed through the real time monitoring for the stress and displacement by automatic meter.

Cited by 0 works.

Authors