국내 초고층 거푸집 공사기간에 영향을 미치는 주요 요인 평가
김대원, 장지선, 신윤석 et al. · 대한건축학회 학술발표대회 논문집 - 구조계 · 2005
Seoul is one of the city where the tall building is many in the world. Usually, structure of tall building is reinforced concrete or steel-reinforced concrete because of vibration and noise between story and story. However cycle time of story in Korea is from 5 days to 10 days that is longer than foreign construction durations. And long cycle time makes long total construction duration. Form work is time-spending work among structure works and has ability to improve productivity. So it needs to be under consideration. Therefore, the purpose of this study is to evaluate main effect factors in duration of form work for tall building in Korea. Evaluated main effect factors will contribute to manager in practice.