조립생산시스템을 위한 DBR 적용 사례연구
윤재홍, 김순문 · 경영논총 · 2010
The DBR(Drum-Buffer-Rope) approach of TOC(Theory of Constraints) is used to achieve the global optimization of unbalanced factory by focusing on the management of capacity constrained resources which restrict throughput of the production system. DBR has widely been recognized as an efficient tool to lower the stock level and to shorten the lead time by pursuing the whole profit rather than achieving a local efficiency. The satisfaction of due date is important competitiveness in the thruster factory which has the characteristics of the product variety and frequent order change. Thus, it is desirable to apply the DBR approach to the thruster factory in order to develop an efficient assembly production system for better productivity. This paper presents the DBR scheduling system for the thruster factory and to apply the DBR scheduling system to the thruster factory. Along this line, this study first introduces general steps of DBR scheduling system in detail and describes the methodology of developing the DBR scheduling system for the thruster factory. The proposed DBR scheduling system is applied to the thruster production process in order to demonstrate the procedures of production scheduling based on DBR.
Cited by 0 works.