디자인 빌드 방식의 프로젝트 관리를 위한 프로세스 개선 모델

김의식, 박상준, 신창현 et al. · 대한건축학회 학술발표대회 논문집 - 구조계 · 2004

Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to Design-Bid-Build Delivering method. In Design-Build project, however, a large construction company and design firm make up consortium as a Design-Build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model in the whole phase of Design-build project. This process model will also support to improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.