The objectives of this study are to propose a suitable treatment facility for waste energy recovery after analyzing the waste generation and disposal situation in Jejudo, to establish the plan to install the solar photovoltaics and wind power plant considering the site conditions and finally to establish the environmental energy town plan in conjunction with the existing facilities. The food waste biogas plant is selected as the treatment capacity of 200 ton/day. It is estimated that the biogas plant will produce the electricity of 7,594 MWh per year, which will reduce the greenhouse gas of 4,177 tCO₂ per year. The solar photovoltaics and wind power plant will produce the electricity of 13,410 MWh per year, which will reduce the greenhouse gas of 7,375 tCO₂ per year. Environmental energy town will give us the reduction of operating cost by centralized treatment of residues and byproducts, and by efficient utilization of produced energy.