원가 진단을 위한 자원소비변화 지표

홍영탁, 유정호, 이현수 · 대한건축학회 학술발표대회 논문집 - 구조계 · 2003

In order to prevent cost overrun, it is required to check the cost overrun factors periodically. The purpose of this study is to suggest three indexes that can help diagnosing construction cost. Total construction cost can be decomposed into individual cost items according to resource consumption. Therefore, it is necessary to control resources that may cause cost variance. The three indexes suggested in this paper are variance of total resource input, variance of individual resource input, and variance of resource balance, where the resource input and resource balance are measured as cost.

Cited by 0 works.

Authors