시뮬레이션 기반 수도권 리사이클링 센터 폐냉장고 전처리 공정 개선
김도균, 강민구, 최진영 et al. · 한국시뮬레이션학회논문지 · 2013
This paper studies the improvement of a pre-processing line for waste refrigerators in a metropolitan recycling center(MRC). We performed ARENA modeling and simulation by using work analysis and time measurement on the current processing line. Combined this result with some practical experiences from workers, we generated 3 alternatives to improve the current line and evaluated them by using ARENA simulation. The final decision selected consists of changing 2-line process into 1-line and having a separate cell-line for collecting refrigerant. Currently, the result of this study was applied to MRC by improving cycle time, throughput, and space utilization compared to the previous one.
Cited by 0 works.
Authors
References
- Determination of New Layout in a Semiconductor Packaging Substrate Line using Simulation and AHP/DEA
- 단백체 스펙트럼 데이터의 분류를 위한 랜덤 포리스트 기반 특성 선택 알고리즘
- A Study on the Present Condition and Improvements of Recycling Policy - The Survey of local governments by affiliated Recycling Center -
- 스마트 네트워크 환경에서의 자원 및 경로 최적화 연구