차세대 고속전철 전두부 연결 구조

유재곤, 김재웅, 김구식 · 한국철도학회 학술발표대회논문집 · 2012

In high speed EMU, the structure of front equipment essentially is needed Coupler connects cars and cars at multi - coupling or emergency rescue as well as Hatch module is that the front shape determine and reduce the aerodynamic resistance in high speed. In addition, any cases of domestic high speed aren’t sufficiently complete for installation of anti-climber device and obstacle deflector because the structure of front was studied about efficient use of space. This paper take advantage of the structure of front equipment applied to HEMU-400X, and it confirm to satisfy Technical Specification and the Law for Railroad safety. From now on, the designing and manufacturing for distributed high speed train is applied it by optimizing.

Cited by 0 works.

Authors