중회귀분석을 통한 콘크리트궤도 레일 휨응력 예측식
성덕룡, 임형준, 이동욱 et al. · 한국철도학회 학술발표대회논문집 · 2010
It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, it measured bending stress of rail according to the rail surface irregularity in the concrete track on the Seoul Metro. In addition, the relationship between rail surface irregularity and bending stress in concrete track is analyzed by results of the field test. Finally, this study clarified the relationship among bending stress(Y) of rail, train speed(U), rail surface irregularity(v, w) in concrete track. The result of this study is able to use the basis data to establishing the periodic replacements criterion of CWR.
Cited by 0 works.