대심도 지하역사 승강장 및 대합실 평상시/비상시 급·배기 풍량에 대한 실험적 연구
장용준, 이호석, 박덕신 · 2012
Shin-gumho station in Seoul underground subway have been selected to be experimentally investigated and analyzed for the real air supply & exhaust capacity compared to the original capacity of ordinary and emergency condition. The depth of Shin-gumho station is 43.6m which consists of the island-type platform (8th floor in underground) and a twostory lobby (first & second floor in underground). An emergency staircase connects between the platform and the lobby. Hot-wire anemometer, capture hood, wind vane & velocity meter and data acquisition systems are employed to perform the automatic measurement in this experiment. For ordinary case, air supply and exhaust capacity in the lobby were reduced by 34% and 46% compared to the original capacity, respectively. Air supply and exhaust capacity in the platform were reduced by 66% and 38%, respectively. For emergency case, air supply in the lobby was reduced by 42% and air exhaust in the platform was reduced by 28% compared to the original capacity. Therefore, air pollution in the station is expected to be worse in the ordinary environment and smoke control capability in the platform will be weakened in case of fire emergency.
Cited by 0 works.