국내 고속철도 교대 접속부 성능수준 및 관리기준
최찬용, 박효성, 이광재 et al. · 한국철도학회 학술발표대회논문집 · 2012
It is important to keep up smoothness of track to operate for high speed railway. However, the bridge transition section of the railway is often a rough-riding spot and one that requires resurfacing at more frequent intervals than does the rest of the track. In the transition zone occurs much more problems than any other parts so that called from a typical vulnerable point in railway. This paper aiming further research and discussion on the technical design and construction in concrete track. It is briefly analyze and discuss about evaluation of design and during the construction control, and their respective solution idea.
Cited by 0 works.