한국형 경량전철시스템의 유지보수 이력에 대한 평가
이호용, 류상환, 조홍식 et al. · 한국철도학회 학술발표대회논문집 · 2008
The K-AGT test line is managed similarly to revenue operation and operated automatically 120km per day, total 90,000km from August 2004 to December 2007. To enhance reliability of developed system, maintenance information system based on RCM is applied. The maintenance program applied in test line is based on RCM which prevent a fault before it happens and a fault made in test line is analysed by reliability growth test. Vehicle system, power supply system, signalling system, track and infrastructure are built in test line and it is reviewed enhancing system performance and changing designs to commercialize through reliability growth analysis method.
Cited by 0 works.