건설현장의 수전설비 및 배·분전반의 현장실태 분석

길형준, 한운기, 김향곤 et al. · 한국조명·전기설비학회 학술대회논문집 · 2004

To analyze risk factors of temporary power installations, the investigation was carried out for power receiving system and patch and panel board at construction sites. The subject was variable such as an airport, an apartment, a municipal playground. There are many risk factors caused by inadequate working environments and the deterioration of temporary power installations using equipment with minimum safety devices at construction sites. Therefore, it is intended to present and preventive measures against electrical shock accidents through analyzing risk factors of real field condition and investigating temporary power installations all over the country.

Cited by 0 works.

Authors