서울도시철도 지하철 터널 무동력 배수시스템 연구

국윤모, 김만화, 정천만 et al. · 한국철도학회 학술발표대회논문집 · 2013

The Seoul Metropolitan Rapid Transit Corporation operates the largest subway system in the Republic of Korea with a total of 157 stations and a total reach of almost 162.2Km. Subway structures are mostly below underground water. So underground water is flowing into the tunnel and gathered into collecting well through drain. Subsequently underground water is pumped out to the ground. If too many underground water came in tunnel, the drain would be overflowed. Overflowed underground water generates radon and deteriorates track materials. Also that spreads foreign matters which are contained the underground water. A foreign matter worsen air quality. The Purpose of this study is to design a siphon and operating method to relieve the overflowed drain. In the past, Iron pipe was used Siphon. But we use transparent high-pressure hose and aluminum coupling to have good workability. Ultimately we solve the overfowed drain by SMRT unpowered drainage system. Compared with the past operating system, our system saves 96% budget and improves air quality of tunnel.

Cited by 0 works.

Authors