지불의사를 이용한 상수도 원수수질개선 편익 산정
여규동, 이충성, 이상원 et al. · 대한토목학회논문집 B · 2009
In existing studies about benefit of water improvement using WTP, the object of survey is described pre-policy water as current water quality and improved (post-policy) water as boatable, fishable and swimmable. Multiply WTP by the number of households of basin is total benefit. The existing studies are not benefit of a specific water resource business but benefit of a policy on unsubstantial water resource business. Because of a lack of objectivity and oversimplification, it is difficult for survey respondents to understand an object of survey. The purpose of this study is to evaluate a benefit estimation methodology for raw water improvement in water resource development business. After conducting a survey of WTP of 1,000 housewives who is using water service in the National Capital region, the relational expression of water improvement (BOD) and WTP is derived by using statistical analysis of the survey. As a case study, the stream water improvement benefit of Song Li Won multipurpose dam was evaluated, which is planned to be built at the local secondary stream section on Nae Sung stream in Nak-Dong River system. As a result of study, annual average benefit evaluation is 5,980 million won on the average annual planned discharge, 8,663 million won on the planned discharge during the period except for wet season (July to October), 11,905 million won on the planned discharge during water declining period and 14,502 million won on the planned discharge during water declining period respectively. By using the relational expression of BOD-WTP, it is easy to estimate the benefit without regard for water quality.
Cited by 0 works.