무가선 저상트램 개발 및 시험 현황
김행구, 강병관, 김동일 et al. · 한국철도학회 학술발표대회논문집 · 2013
The first catenary-free low floor tram in Korea has started to be developed in 2009 and finished manufactured in Feb. 2012 supported by Ministry of Land, Infrastructure and Transport. Equipped with litium-polymer battery of 162kWh energy capacity, it is able to run the longest distance in existing catenaryfree trams only using on-board battery energy without additional charging or supplying power. As it is designed to run with catenary for the purpose to operate longer distance and reduce battery charging time, track design is enabled more flexible. During Yeosu Expo exhibition from May to August 2012, it has been demonstrated to the public at the Yeosu Expo station. In Nov. 2012, the construction of tram test track with 1km section has been finished and the tram has continued running test until now. After starting the phase 2 R&D period in 2013, the signaling system will be installed, extend the test track with catenary and the integration test will be conducted.