원전 경쟁노형 건설 신기술 · 신공법 및 건설기술 트렌드 분석
김좌영, 방창준, 이병수 et al. · 대한건축학회 학술발표대회 논문집 · 2013
Hitachi is developing big-modularization, area construction, parallel construction, open-top construction, pre-engineering, site-construction management system for NPP construction. Toshiba is considering parallel construction method through open-top construction method, auto-welding, all-weather construction for NPP construction. AREVA make an attempt concrete slab one-step pouring in foundation construction site and prevent delay of construction schedule by application of air-tent. Also, AP1000 is developing modularization and open-top construction method for NPP construction.