보조 히트싱크 적용 지열 히트펌프 시스템의 냉난방 성능 예측
손병후, 최재호, 민경천 · 대한설비공학회 2013년도 하계학술발표대회 · 2013
A hybrid geothermal heat pump(HGHP) system can decrease the first cost of geothermal heat pump systems by using conventional technology(such as a cooling tower or a boiler) to meet a portion of the peak cooling or heating load. This preliminary study presents simulation results of the performance of HGHP system using a cooling tower. In order to demonstrate the performance of the hybrid approach, monthly and hourly simulations were conducted over 20-year periods with respect of load coverage by cooling tower. The monthly simulation results for both standalone GHP and hybrid GHP system showed that the maximum temperatures of brine returning from the ground were in a range of design target temperature of 30℃ for cooling. However, the hourly simulation results showed different prediction results. Finally, our study showed that the HGHP with a cooling tower for cooling unbalanced building can be a performance effective than ground-source only or conventional systems.
Cited by 0 works.