Нормирование показателей извлечения из недр при разновременной отработке запасов
С. А. Вохмин, Требуш Юрий Прокопьевич, Georgii S. Kurchin et al. · Современные проблемы науки и образования · 2012
Calculation of the interconnected losses and dilution ores is resulted at working off deposits by systems with the flat bottom. Standard sizes of the interconnected losses and dilution ores are defined a variant-analytical method by criterion of the maximum profit with 1 t the extinguished balance stocks of a mineral on the basis comparison economic consequences dredging stocks ore on working off contours. Thus at the mountain enterprises it is accepted to plan conducting mountain works for a calendar year thereof sizes of losses and dilution on stages of working off stocks a layer are necessary for considering ores separately – carrying out cutting development it can be carried out during one accounting time period, and dredging of the remained stocks of a layer in another. In this case the account of indicators of extraction is necessary for making differentially. In the presented work possible variants of an arrangement of cutting developments and settlement schemes are considered.
Cited by 0 works.