도시형자기부상열차 실용화사업 특성에 따른 설계 인터페이스 관리
신병천, 김원중, 박도영 et al. · 한국철도학회 학술발표대회논문집 · 2010
Korea's Urban Maglev Program (UMP) started in December 2006. The total program budget is expected to be 450 million US Dollars, including contributions from the private sector, Incheon International Airport (IIAC) and City of Incheon. The objectives of the program are to develop the competitive urban transit maglev vehicle and to construct a 6.1 km urban maglev demonstration line at Incheon International Airport by 2012. Conventional railway construction project performs the civil design and construction after confirming vehicle specifications and related regulations. Therefore new technical interface issues between the vehicle and civil engineering are rare. On the other hand, Urban Maglev Program requires the vehicle development and civil design/construction simultaneously, such that multitude of critical technical interface issues are generated. The control and management of technical interface issues to affect both the vehicle and civil engineering have been very important and critical for the successful project completion. This paper shows some of interface issues and the interface resolving procedures adapted in Urban Maglev Program.
Cited by 0 works.