궤도-교량 상호작용 해석 시 하중이력 고려방법에 따른 비교연구
Myoung Soo Kim, 윤경민, 이진옥 et al. · 한국철도학회 학술발표대회논문집 · 2012
In case of the continuous welded rail(CWR) track is supported by the railway bridge, the additional axial force is occurred in the CWR due to the track-bridge interaction. In the various design codes such as Korean code, European code, UIC code, etc, three important loads(temperature variation in the bridge-deck, braking/acceleration and the bending of the bridge-deck resulted from the passing train) are treated as the independent loading case. This conventional method completely neglects the influence of the loading history, and may have some error because of the behavior of the longitudinal resistance connecting the rail and the bridge-deck is under the highly nonlinear. In this study, the algorithm for the modified method considering the sequential nonlinear loading combination and the effect of the loading history is proposed. And the results from the application of the modified methods are compared with the results obtained from the conventional method.
Cited by 0 works.