강관 조립 틀비계의 성능 분석

송길호, 곽순섭, 김호수 et al. · 대한건축학회 학술발표대회 논문집 - 구조계 · 2003

About the steel pipe built-up scaffolding(BTS), which is being used in domestic construction sites, there are no related codes to the overall capacity of the BTS in the Industrial Safety and Health Act (ISHA) but only the ones which describe the testing method and the capacity of the each member of BTS. So we need to know the full capacity of the BTS at the time of the being used stage, not the ones of the members but the one of the total BTS frame. In this study, first, the vertical frame member which is the basic element of the BTS frame, is tested for its capacity. Second, the load test about the full strength of the BTS system are performed in two ways namely, for the first-story and the second-story BTS frame. In each case, the centric load(1/2 L) test and the eccentric load(1/4 L, 0L) tests are carried out, where L is the longer length of the BTS frame. According to the results of the experiments, first, the load endurance capacity of the first-story BTS frame are larger than the one of the second-story BTS frame at the same conditions. Second, the centric load endurance capacity is bigger than the one of the eccentric loading in the same story BTS system structure.

Cited by 0 works.

Authors