인천공항 시범노선 자기부상열차 종합시험운행계획

김봉섭, 박정웅, 한형석 et al. · 한국철도학회 학술발표대회논문집 · 2012

The Urban Maglev demonstration line is under construction in Incheon International Airport as of now, and it will be opened in the second half of 2013. Since Urban Maglev Program started in early 2007, the first prototype vehicle debuted at the test line of Korea Institute of Machinery and Materials in December 2009. The vehicle was continuously improved through a variety of functional and performance tests at the tese line, and a normal business operation is planned at the pilot routes of Incheon International Airport in the second half of 2013. Based on the Rail Safety Act, a comprehensive running test includes facility verification tests ensuring the safety between the vehicle and thw various facilities and total interfacing tests related to vehicles, power, guideway, catenary, singaling, communication, stations, bases, and so on. Unlike the general railway system, the magnetic levitation system does not have a formal comprehensive test cases, and hence system-specific testing plans such as interfaces between facilities are necessary. In this paper, facility verification tests, total interface tests, etc. will be covered with regard to the comprehensive testing plan of the Urban Maglev train in Incheon International Airpot.

Cited by 0 works.

Authors