도상개량에 따른 부족캔트 조정사례 연구

김광은, 최삼혁, 오희완 et al. · 한국철도학회 학술발표대회논문집 · 2012

At the time of opening, 81% of mainline tracks of Seoul Metro were built with ballasted tracks due to limited technical capability, construction cost and construction period. All the ballasted tracks have been promoted to replace to slab tracks due to its deterioration of track function resulting from the wear of ballast by abrasion and fragmentation by long-term use and its requirement of higher maintenance cost and more frequent repairs and maintenance. In this study, in order to apply the appropriate cant suitable for real site condition when improving tracks, the relationship and effect of rail wear before and after adjusting cant have been analysed by taking the curves of tracks and driving speed into consideration.

Cited by 0 works.

Authors