갱구부 사면안정대책으로서 압성토공법의 적용
천병식, 신영완 · 한국지반환경공학회 학술발표회논문집 · 2004
Application of various materials has been increased in construction. The design and construction cases of corrugated structural plates instead of reinforced concrete for a cut & cover tunnel construction are described in this paper. A large slope near the tunnel entrance is cut and tension cracks are produced in the slope face during construction. Because a large amount of cut soil and rock has to be dumped in this field, the counterweight fill of backfill after cut and cover tunnel construction is adopted in optimal alternative plan. It is estimated that application of corrugated structural plates contributes to 70% decrease in construction period and 20% decrease in construction cost.