도상안정제에 의한 고속선 교량상 궤도틀림 저감 효과 분석
강태구, 배현웅, 윤경민 et al. · 한국철도학회 학술발표대회논문집 · 2012
From the investigation of analysis results on the track inspection and maintenance history of the Kyungbu high speed line (First phase) from Seoul to Dongdaegu, it was found that the track irregularity most frequently occurs on the bridge zone among the subgrage, bridge and tunnel zones. Therefore, the reduction strategies of the track irregularity in the bridge expansion joint zone are an important issue in the ballasted track on the high speed railway bridge. Among the many methods which are suggested as a countermeasure to reduce the looseness of ballast gravels according to the expansion behavior of the bridge expansion joint, the effects of the spray of ballast stabilizer on the reduction of the track irregularity are investigated in this study. A comparative analysis on the intensity of the maintenance work is conducted based on the history of the track inspection and maintenance work.
Cited by 0 works.