성남~여주 복선전철 전차선로 설계

최태수, 유향복, 박병곤 et al. · 한국철도학회 학술발표대회논문집 · 2013

Seongnam~Yeoju double-track rail routes, Seongnam, Gwangju, I-cheon, Yeoju via a 57km section of the double-track train passing through downtown is built with a dedicated section. Most of the route through the downtown tunnel structure in nature as a roadbed for this configuration because the tunnel cross section to minimize the construction costs and shorten the construction period has been emerging as issues. Thus, Seongnam-Yeoju double track catenary designed to train in the tunnel crosssectional area in the design speed and catenary simple standard stringing method, depending on the size of the standard wiring method is simple, low gago type a simple wiring catenary, rigid catenary system by applying the R-bar design speed of trains Fits increased speed in preparation for the future design was applied.