시뮬레이션 기법을 이용한 철도차량 중정비 공장 설계검증

전병학, 장성용, Won‐Young Lee et al. · 한국시뮬레이션학회 학술대회 논문집 · 2009

In the railroad rolling stock depot, long-term maintenance tasks is done regularly every two or four year basis to maintain the functionality of equipments and rolling stock body or for the repair operation of the heavily damaged rolling stocks by fatal accidents. This paper addresses the computer simulation model building for the rolling stock maintenance shop for the CDC(Commuter Diesel Car) and Generator Car planned to be constructed at Daejon Rolling Stock Depot, which will be moved from Yongsan Rolling Stock Depot. We evaluated the processing capacity of two layout design alternatives based on the maintenance process chart through the developed simulation models. The performance measures are the number of processed cars per year, the cycle time, shop utilization, work in process and the average number waiting car for input. The simulation result shows that one design alternative outperforms another design alternative in every aspect and superior design alternative can process total 340 number of trains per year 15% more than the proposed target within the current average cycle time.

Cited by 0 works.

Authors