중규모 태양광발전시스템 장기 실증운전 평가

김의환, 안교상, 임희천 · 한국신재생에너지학회 학술대회논문집 · 2009

The 50 ㎾p grid connected photovoltaic system which was installed at KEPRI site in 1999 has been operated more than 10 years. In order to acquire long term operation characteristics of medium size photovoltaic system, the operation test data related on power generation electricity and capacity factor of 50 ㎾p system, which have been collected since 1999, were analysed. From the analysing results, 57.7 ㎿h in annual power generation electricity of.50 ㎾p photovoltaic system in 1999 has been decreased 49.1 ㎿h in 2005 and reached 41.9 ㎿h in 2008. In addition to, the capacity factor of 50 ㎾p photovoltaic system also showed 13.2 % in 1999, 11.2% in 2005 and finally reached 9.6% in 2008. The operation test data showed a trend of decreasing of generation electricity and capacity factor during the 10 years operation time and we guessed that was caused by solar cell performance degradation and decreasing of PCS system efficiency.