수리모형실험을 통한 오창댐 여수로 계획안 검토
박병준, 김하집, 하재율 et al. · 한국농공학회 학술대회초록집 · 2006
To estimate capacity of plan for Ochang dam spillway, hydraulic physical scale model test was executed. In result, the plan was very stable and safe. Even if the length of weir is smaller than 25.0m, capacity was enough. So it could contribute for economic dam design and construction works.
Cited by 0 works.