제약사항을 고려한 보증 유도탄 시뮬레이션 기법 연구

이계신, 이연호, 조용석 et al. · 한국시뮬레이션학회논문지 · 2011

Certified Missile Round Concepts that is one-shot device use the periodic inspection policy to improve the continuously deteriorated reliability. In this paper, we suggest dormant reliability prediction model by simulation with real operational environment. The suggested prediction model is based on optimal inspection period decision model and additionally considers various constraints; moving, inspection or repair service time. The simulation results show the constraints affect dormant reliability and missile availability. Lastly, we suggest building up a depot to resolve the above problems by the suggested simulation model.

Cited by 0 works.

Authors