모니터링 장치를 이용한 절연구간 통과시스템에 대한 파형 분석
신효범, 한문섭, 창상훈 et al. · 한국철도학회 학술발표대회논문집 · 2012
On AC railway system, the neutral sections are installed in front of substations and sectioning posts in order to avoid a crash between different phases. In case railway vehicles pass through these neutral section, it is necessary for them to switch off be derived by notch-off. This may reduce speed of the vehicles, resulting lowered train operation efficiency. For this reason, the system using thyristor devices is under development. In this paper, the test waveform using a monitoring device for the development of automatic changeover system in the neutral section has measured.
Cited by 0 works.