하수 슬러지 폐열원을 이용한 재생 에너지의 경제성 평가
이종호, 박승상, 백종현 et al. · 대한기계학회 춘추학술대회 · 2011
In this study, economic evaluation of the waste heat recovery system combined with heat exchanger and the high temperature heat pump was suggested and investigated. It was designed that the system used the heat of wastewater from sludge-drying process. Based on the annual heat production of the system, bunker-C oil boiler and LNG boiler of the same capacity are compared, respectively. As a result, when the system operates for 15 years, payback period of this system predicts about 2.6~3.2 years in bunker-C oil boiler and about 2.7~3.4 years in LNG boiler, respectively.
Cited by 0 works.