설계속도향상에 따른 사업비 최적화 방안 고찰
노병국, 김용배, 이종국 · 한국철도학회 학술발표대회논문집 · 2009
After Kyeongbu KTX service in 2004, Korea became enrolled as the 5th country which operate high speed rail service all over the world. Although the high speed rail service has not extended to the all of the country, Kyeongbu high speed rail line brought out the considerable change in life and business style in Korea.. The main reason of these change was caused by the priority of higher speed. And shortening the running time to 2 hours, the completion of Ho-nam and 2nd phase Kyeongbu KTX line will affect the priority of speed sharing in transit system. But the technical gap of railroad condition between the speed of high speed rail as 350㎞/h and the one of existing Kyeongbu line as 200㎞/h is the urgent problem to be solved. So it is very urgent to upgrade the speed of main line railroad from 200㎞/h up to 270㎞/h. In the guide line of railroad design, the velocity of train is defined very widely from 200㎞/h to 350㎞/h. This speed range could cause some problems of construction standard and increasement in construction cost caused by the modification of the structure's dimension, and the total cost maybe affect to B/C ; the decision making element to initiate the railroad project. Now in this paper, the optimization method of construction cost will be proposed by way of reviewing the factor which affect on the dimension of tunnel and bridge, the location of cable tray and the height of trolley and so on. Now there will be an great requirement of Green Transportation in railroad industry. In this paper, the method of improving the railroad operation speed will be discussed to by maintaining(or improve) the ratio of benefit and cost by way of optimization of construction cost to prepare the upcoming tremendous change in trading between North Korea and South Korea.
Cited by 0 works.