커튼월공사의 공기산정 예측모델 개발

임진호, 현창택, 홍태훈 et al. · 대한건축학회 학술발표대회 논문집 - 구조계 · 2009

The research and development of curtain wall construction management are very insufficient due to economic difficulty and imbalance of manpower demand and supply of curtain wall construction enterprises. The theoretical consideration of construction productivity was carried out to suggest a necessity of construction prediction about working days in the domestic construction work, and the necessity of construction period calculation was suggested by understanding the actual condition of the curtain wall construction through characteristics of curtain wall and comparisonㆍanalysis of the present situation. After the working days' prediction method of the existing curtain wall construction was classified into regression analysis, factor analysis and hierarchical multiple regression analysis and considered to establish a prediction model to be suggested in the present study, a regression model process was established by selecting regression analysis as an analysis method using an objective quantified numerical value, and thus the working days' prediction model was built by setting an architectural area, working manpower, the number of total floors as an influence factor affecting major variables of working days' prediction of the curtain wall construction. It is expected that it will be helpful for a curtain wall construction builder to set up a proper construction period through the predicting regression mode in the construction planning stage.

Cited by 0 works.

Authors