A methodology to predict the output performance of small hydropower(SHP) plant using treated effluent in wastewater treatment plant has been studied. An existing waste water treatment plant, located in Kyunggi-Do was selected and the output performance characteristics for these plants were analyzed. Based on the models developed in this study, the hydrologic performance characteristics for SHP sites have been analyzed. Additionally, primary design parameters such as design flowrate, capacity, operational rate and annual electricity production were estimated. The results showed that the flow duration characteristics of small hydropower plant for wastewater treatment plant were significantly different compared with the small hydropower plant for river.