관로계통 및 가압펌프장 수격에 따른 최적 안정성 확보방안
라병필, 박종호 · 유체기계 연구개발 발표회 논문집 · 2009
This paper is performed to find out the stability of water-hammer in pipe line and pump station that is happened when additional water needs demanded. At first, the water supply construction project is planned to supply 6,000 ㎥/day through 17.9 ㎞ pipe line. But additional demand (1,200 ㎥/day) happened from Cheong-ra water reservoir. In this situation, air-chamber(4 ㎥) and vacuum breaker valve(φ100 ㎜) are needed to prevent water-hammer. When the additional water is supplied, the existing facilities (air-chamber, vacuum breaker valve) are sufficient to alleviate shock not changing capacity alteration, judging from the airspace change and rise. Therefore, there is no problem for water-hammer by installing air-chamber(4 ㎥) and vacuum breaker valve(φ100 ㎜) at the top of Yeo-ju hill.