조선 블록조립공장에서 용접 정보를 이용한 실적집계 및 모니터링 방안
안의국, 이호윤, 이대형 et al. · 한국CAD/CAM학회 학술발표회 논문집 · 2011
During this time of global recession, the shipbuilding industry is exerting much effort to make profits, gradually intensifying the competition. In shipbuilding, however, the Engineering To Order (ETO) production method and production process are difficult and frequently changeless. Thus, the shipbuilding process must be actively reflected on the schedule plan rather than setting up a fixed plan once and sticking to it. For this purpose, a monitoring system must be developed, which obtains field performance data as accurately and quickly as possible. However performance data collection are difficult without a performance data collecting and monitoring system. In this paper, a method for identifying the progress of detailed processes for blocks by facilitating the data input into the block erection process, and for differentiating fitting and welding using the current values obtained from the welding machine, present. Furthermore, this paper propose a method of identifying the work progress of blocks through a correlation equation between the welding length and arc time of the block based on the acquired current data. Then the proposed method verify through experiments and suggest for progress management in block assembly shop of shipbuilding.
Cited by 0 works.