경량전철시스템에서 건설관리 적용을 위한 단계별 문제점 해결 방안
연상호, 김학두, 이영욱 · 한국철도학회 학술발표대회논문집 · 2012
lot of trial and error in order to build a Light Rail Transit System (LRTS) in South Korea, a breakthrough has been achieved. Construction management(CM) under the leadership has been involved in the business of each field in the form of a consortium with relatively advanced technology and state-of-the-art construction technology, production and operation in the field of railway vehicles. In this study is to derive and analyze some problems that could occur in the course of the business of preparing and promoting LRT, the failure does not repeat again in the future similar projects during this study in order to examine the research was carried out, the construction management has been studied through case analyzes and problems derived mainly divided preparatory steps, bidding, contract stage, design management, permitting, process management, and construction management. A result, frequent design changes and E&Ms excessive interference is ready to step from plenty of discussion and issues to predict not because waste time and budget, may result in unnecessary process management to advance sufficient review the requirements were.
Cited by 0 works.