[미발표]도시철도 구조물의 내진성능보강 시범시공
김시격, 권민호, 한동은 et al. · 한국철도학회 학술발표대회논문집 · 2012
As Earthquake Preparedness Act (2008) effected, urban transit operating authority has been planning evaluation of seismic resistance and strengthening plan. Seoul Metro, which operates on the Seoul Subway Line 1 to 4, carrying out seismic retrofit design based on the results of detailed assessment investigated after 2010. Standardized seismic retrofit research team developed a seismic retrofitting system to target a variety of urban rail structure and planed a pilot demonstration.A pilot construction will be carried in Seoul and Gwangju Metropolitan Rapid Transit running on the Metro section and detailed design of retrofitting is conducted in this study.
Cited by 0 works.