실시간 레일절손 모니터링 시스템의 현장 적용에 관한 연구
최시행, 고광남, 정수영 et al. · 한국철도학회 학술발표대회논문집 · 2011
As a result of the examination analyzed loop type of Detecting the Broken Rail Monitoring System as a part of prevention of train derailment, installed in the Seoul Metro No. 2 subway line 98.51m section which is Samsung to Seolleung, we found that it is possible to detect crack location(Thermit welding: 48.18m) within the margin of error of ±1m accurately As analysis of the first day, third day, fifty day, and seventh day periodically, we found that Fresnel reflection happened where the crack location 48.18m. However other 3 branches show loss by bending of optical cable(spread reflection from the outside impact)
Cited by 0 works.