초고층 건축공사 공정계획 지원 도구 개발 방향

신재원, 유정호, Sang-Hun Song et al. · 대한건축학회 추계학술발표대회 논문집(구조계) · 2004

Recently, tall building became a main topic of recent construction industry, because it is regarded as a vertical alternative solution to the limited horizontal extension. Since the construction of tall building has relatively short history, it is lack of data and experience that can be used as a source for project scheduling. As a result, in industrial field, the strategy of schedule planning for normal construction is attributed to the tall building. However, in spite of the differences between tall building and normal building, there is no consideration for applying the differences to the schedule planning. This study suggests schedule planning process fits to tall building construction project and a direction to a schedule planning system development for tall building.