초고층 마감공사에서 옵션을 고려한 공기-비용 절충방안
노산, 류한국, 이현수 et al. · 대한건축학회 학술발표대회 논문집 - 구조계 · 2005
As buildings are high-rised, diversified, complex and large-sized, these buildings are faced with Time-Cost Trade-Off Problem(TCTP). Time-Cost Trade-Off is a scheduling technique to shorten the duration with a minimum added cost. Traditional Time-Cost Trade-Off analysis assumes that the time and cost of an option for an activity are deterministic and focus on the technique to minimize construction cost and time. However, methods for generating the options are not studied to solve the TCTP. Therefore, the objective of this study is to help construction manager make a decision by proposing the option generating method and the relationship of time and cost according to these options for high-rise building finishing work.